Engineering structures on Expressway No. 74 - Mosty Łódź S.A.

Engineering structures on Expressway No. 74

Mosty Łódź carried out bridge works under the project "Eastern Exit from Expressway S74 in Kielce".

The work was performed from May 2009 to December 2011. On the out-of-town section of the project, Mosty Łódź built two structures – a motorway bridge and a viaduct. On the city section, Mosty Łódź designed and built a viaduct and a footbridge.

News and events

Read all