Bridge in Połaniec

The bridge was built under the following project: "Removal of Barriers to Development – the Bridge over the Vistula River with the Extension of Voivodeship Road No. 764 and Connection to Voivodeship Road No. 875." As a member of the consortium, Mosty Łódź carried out the part of the project involving bridge work.

The construction work began in October 2010 and was completed in November 2014. The constructed bridge is a steel structure with a reinforced concrete platform with a length of 957 m and a total width of 15 m. As many as 643 reinforced concrete piles with a total length of 7.5 km were used for the construction.

Project challenge:The bridge on the Stary Breń River was also built as part of the project. It is a 115 m long three-span structure.